Initial Setup Script for Subordinate Secondary Fabric Interconnect

After the primary UCS Fabric Interconnect is configured, remove the RJ-45 connection from the Cisco UCS Fabric Interconnect A and plug it into the same port on Fabric Interconnect B. Reestablish the console connection and you will be prompted with this dialog. Make sure you have cabled the L1-L2 connections correctly (as per Figure 14-3) and collected the information that you need to input during the subordinate peer setup dialog. Figure 14-6 shows the information needed for the initial setup of the subordinate Fabric Interconnects.

Image

Figure 14-6 Initial Cluster Setup for Subordinate ...