Index

acceptance, test

acronyms, list of

Activity Performance Levels (APL)

linear

non-linear

aggregate production, plan (elements)

demand variation

planned horizon determination

production bottlenecks

resource smoothing

aggregate production, plan (optimize)

cost of inventory

cost of plant underutilization

cost of smoothing

cost of unit production

alpha-cut, fuzzy

definition

sensitivity analysis

Anticipatory Failure Determination (AFD)

end state

failure scenario

initiating event

inverted logic

planned scenario

As Low as Reasonably Practicable (ALARP)

automatic random, test

black box

basic, test

environment, test

high volume, test

phase, test

special, test

book structure

boundary value, test

Built In Test (BIT), assess

Certification and Accreditation (C&A), test

Classification Tree Method (CTM)

component and code coverage, test

component and subsystem, test

configuration, audit

Functional Configuration Audit (FCA)

Physical Configuration Audit (PCA)

control chart

c-Control chart

p-Control chart

R-Control chart

X-Control chart

decision table, test

defect management/tracking

classification

priority

process

risk factors

severity

Design Of Experiments (DOE)

design tools, validate

design vs. implementation, verify

destructive, test

development, VVT activities

definition

design

implementation

integration

qualification

dilemma, fundamental VVT

disposal

ongoing, assess

peer review, conduct

process, test

simulation, assess by

system plan, assess

VVT plan, develop

Electro-Magnetic Compatibility ...

Get Verification, Validation, and Testing of Engineered Systems now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.