Answers to Selected Exercises

Chapter 2

  • 1. 9

Chapter 3

  • 1. S2 = 7.3. Adding a constant to every number in a sample does not change the value of S2.
  • 5. (a) 0.95053; (d) 0.9545; (e) z0 = 1.96.
  • 7. images.
  • 9. 0.06681. The probability is approximate since the particular probability distribution was not stated.
  • 15. 2. We have 3% as the estimate of the proportion nonconforming, and conclude that the process needs improving.
  • 17. 0.9727.
  • 22. (c)

Chapter 4

  • 5. The control limits could be adjusted or a control chart of residuals could be used.
  • 20. 80.5

Chapter 5

  • 2. 13, 2.
  • 3. The moving ranges and moving averages are correlated so interpreting the charts can be difficult.
  • 5. An images chart is more sensitive in detecting a shift in the process mean (as the answers to exercise 2 indicate).

Chapter 6

  • 1. 0.0462 and 0.2583.
  • 3. Because there will not be a lower control limit.

Chapter 7

  • 3. (a) images; (c) decrease, 0.02278 (before), 0.0027 (after).
  • 5. 1.479, no.

Chapter 8

  • 2. (a) 5.75 assuming a basic CUSUM scheme; (b) 15.
  • 3. When doubt exists as to whether or not an assignable cause was removed.

Chapter 9

  • 1. (a) 11.58.

Chapter 11

  • 2. (a) No outliers are identified; (b) the estimate of sigma is 3.21.

Chapter ...

Get Statistical Methods for Quality Improvement, Third Edition now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.