Index

A

ABL. See Average buffer level

Assembly line, 1–2

Average buffer level (ABL)

line design element, 28

unbalanced mean operation time, 38–39

unbalanced service time means and variabilities

buffer capacity and degree of imbalance, 62–63

mean operation times and variabilities, 61–62

unequal means, variabilities, and buffers, 81–83

unequal variabilities and buffer capacities, 77

uneven buffer capacities, 55

uneven mean service times and buffer sizes, 69

Average work time, 20

B

Balanced lines

definition, 7

vs. unbalanced lines, 15–20, 85

Best and worst configurations, 38, 40–41

Bottlenecks, 19

Bowl-shaped pattern, 36–37

Breakdown

production lines, 84

unbalanced lines, 83–84

Bucket Brigade system, 10–11

Buffer allocation

line design element, ...

Get Production Line Efficiency now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.