Problems

1. Two workers have the job of placing plastic labels on packages before the packages are shipped out. The first worker can place 1000 labels in 30 minutes. The second worker can place 850 labels in 20 minutes. Which worker is more productive?

2. Last week a painter painted three houses in five days. This week she painted two houses in four days. In which week was the painter more productive?

3. One type of bread-making machine can make six loaves of bread in five hours. A new model of the machine can make four loaves in two hours. Which model is more productive?

4. A company that makes kitchen chairs wants to compare productivity at two of its facilities. At facility #1, six workers produced 240 chairs. At facility #2, four workers produced 210 chairs during the same time period. Which facility was more productive?

5. A painter is considering using a new high-tech paint roller. Yesterday he was able to paint three walls in 45 minutes using his old method. Today he painted two walls of the same size in 20 minutes. Is the painter more productive using the new paint roller?

6. Aztec Furnishings makes hand-crafted furniture for sale in its retail stores. The furniture maker has recently installed a new assembly process, including a new sander and polisher. With this new system, production has increased to 90 pieces of furniture per day from the previous 60 pieces of furniture per day. The number of defective items produced has dropped from 10 pieces per day to 1 per day. ...

Get Operations Management: An Integrated Approach, 5th Edition now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.