CASE: FabQual Ltd.

FabQual Ltd. manufactures parts and subassemblies for a number of small-volume manufacturers of specialized construction equipment, including bulldozers, graders, and cement mixers. FabQual also manufactures and distributes spare parts. The company has made a specialty of providing spare parts for equipment no longer in production; this includes wear parts that are no longer in production for any OEM.

The Materials Management Group (MMG) orders parts—both for delivery to a customer's production line and for spares—from the Fabrication Department. Spares are stocked in a finished goods store. FabQual's part number 650810/ss/R9/o is a wear part made only for spares demand. It has had demand averaging 300 units per week for more than a year, and this level of demand is expected to persist for at least four more years. The standard deviation of weekly demand is 50 units.

The MMG has been ordering 1300 units monthly of part number 650810/ss/R9/o from the Fabrication Department to meet the forecast annual demand of 15,600 units. The order is placed in the first week of each month. In order to provide Fabrication with scheduling flexibility, as well as to help with planning raw material requirements, a three-week manufacturing lead time is allowed for parts.

In the Fabrication Department, two hours is now allowed for each setup for a run of part number 650810/ss/R9/o. This time includes strip-down of the previous setup; delivery of raw materials, drawings, tools and ...

Get Operations Management: An Integrated Approach, 5th Edition now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.