Option 1: Multiple Virtual Machine Manager Instances

This option requires that the team designs a separate VMM instance for each Management Group that contains VM hosts. The VMM server in each VMM instance will be connected to the Root Management Server (RMS) of the Operations Manager Management Group, as shown in Figure 4,

Figure 4. One VMM instance is designed for each Operations Manager Management Group.

If the project team chooses this option, determine which Management Groups will contain VM hosts that are within the project’s scope. Record the decision and list the Management Groups in Appendix B: "Operations Manager Integration ...