Decisions
This guide addresses the following decisions and/or activities that need to occur in preparing for Virtual Machine Manager planning. The seven steps below represent the most critical design elements in a well-planned Virtual Machine Manager design:
Step 1: Define the Project Scope
Step 2: Determine Whether to Integrate with Operations Manager 2007 for Reporting
Step 3: Design Operations Manager Integration
Step 4: Determine the Number of Virtual Machine Manager Instances Required
Step 5: Size and Place the Virtual Machine Manager Server, SQL Server-Based Server, Database, and Web Server
Step 6: Size and Place the Library Servers and Libraries
Step 7: Design the Network Connections
Some of these items represent decisions that should be made. ...
Get Microsoft System Center Virtual Machine Manager 2008 now with the O’Reilly learning platform.