Looking at the following table, we are using exactly the same figures, but we have also selected Datastore disk space to be included as a container for capacity management. This has had quite a dramatic effect on the capacity remaining score, as we are now down to 2.5% remaining capacity (or 2 VMs, based on disk space):
Used |
Average VM Usage |
Total Capacity |
Used Capacity |
Remaining Capacity |
|
CPU |
Yes |
3.0 GHz |
560.0 GHz |
300.0 GHz |
260.0 GHz (46.4%) |
Memory |
Yes |
7.0 GB |
800 GB |
700 GB |
100 GB (12.5%) |
Disk I/O |
No |
2.6 MBps |
760 MBps |
260 MBps |
500 MBps (65.7%) |
Network I/O |
No |
3 Mbps |
20,000 Mbps |
300 Mbps |
19,700 Mbps (98.5%) |