International Journal of Information Technology Project Management (IJITPM) Volume 5, Issue 1

Book Description

This fully refereed journal examines current, state-of-the art research in the areas of information technology project management, and the interactions, linkages, applications, and support of project management using information systems. The journal encompasses theoretical, analytical, or empirical research, comprehensive reviews of relevant research, technical reports, book reviews, and also case studies of effective applications in this area. The use of new frameworks, principles, technologies, methods, and techniques are emphasized.

This issue contains the following articles:

  • A Computer-Aided Conceptual Cost Estimating System for Pre-Stressed Concrete Road Bridges
  • A Neural Network Model for Predicting Cost of Pre-Fabricated Housing
  • Microblogging in Project Management: Improving Project Communication and Documentation with Status Information
  • An Integrated Information System for Monitoring Construction Works
  • The Project Management Perspective for a Digital City
  • Managing Preliminary Requirements Information in Information Technology Projects
  • Approaching IT Automation Decisions using Analytic Hierarchy Process (AHP)
  • Fuzzy Based Project Time-Cost Optimization Using Simulated Annealing Search Technique

Table of Contents

  1. Cover
  2. Masthead
  3. Call For Articles
  4. Special Issue on Information Systems Applications in Project Management:
    1. REFERENCES
  5. A Computer-Aided Conceptual Cost Estimating System for Pre-Stressed Concrete Road Bridges
    1. ABSTRACT
    2. INTRODUCTION
    3. PREVIOUS RELEVANT COST STUDIES AND RESEARCH
    4. CONCRETE BRIDGES OF THE EGNATIA MOTORWAY AND DATA COLLECTION
    5. PROPOSED METHOD FOR PRE-DESIGN COST ESTIMATES AND MATERIAL ESTIMATING MODELS
    6. PROPOSED COST ESTIMATING SYSTEM
    7. CASE EXAMPLE
    8. CONCLUSION
    9. REFERENCES
  6. A Neural Network Model for Predicting Cost of Pre-Fabricated Housing
    1. ABSTRACT
    2. INTRODUCTION
    3. THE PROBLEM AND THE HYPOTHESES
    4. METHODOLOGY
    5. THE MODEL FEATURES
    6. APPLICATION OF NN ON THE PROBLEM
    7. THE DISCUSSION AND LIMITATIONS OF THE MODEL
    8. CONCLUSION
    9. REFERENCES
  7. Microblogging in Project Management:
    1. ABSTRACT
    2. INTRODUCTION
    3. MICROBLOGGING AND PROJECT MANAGEMENT
    4. REAL WORLD MICROBLOGGING CASES
    5. DISCUSSION AND FUTURE RESEARCH
    6. CONCLUSION
    7. ACKNOWLEDGMENT
    8. REFERENCES
  8. An Integrated Information System for Monitoring Construction Works
    1. ABSTRACT
    2. INTRODUCTION
    3. THE INTEGRATED SYSTEM
    4. EXPERIENCES DRAWN FROM SYSTEM IMPLEMENTATION
    5. CONCLUSION
    6. REFERENCES
  9. The Project Management Perspective for a Digital City
    1. ABSTRACT
    2. 1. INTRODUCTION
    3. 2. THE CONTEXT OF THE DIGITAL CITY
    4. 3. THE PROJECT MANAGEMENT PERSPECTIVE FOR A DIGITAL CITY
    5. 4. CONCLUSION
    6. REFERENCES
  10. Managing Preliminary Requirements Information in Information Technology Projects
    1. ABSTRACT
    2. INTRODUCTION
    3. THEORETICAL BACKGROUND
    4. RESEARCH DESIGN
    5. RESULTS
    6. SUMMARY AND DISCUSSION
    7. CONCLUSION
    8. REFERENCES
  11. Approaching IT Automation Decisions using Analytic Hierarchy Process (AHP)
    1. ABSTRACT
    2. INTRODUCTION
    3. ANALYTIC HIERARCHY PROCESS
    4. PROBLEM DESCRIPTION
    5. METHODOLOGY
    6. RESULTS
    7. CONCLUSION
    8. REFERENCES
  12. Fuzzy Based Project Time-Cost Optimization Using Simulated Annealing Search Technique
    1. ABSTRACT
    2. INTRODUCTION
    3. LITERATURE REVIEW
    4. FUZZY SET THEORY
    5. SIMULATED ANNEALING (SA)
    6. PROBLEM FORMULATION
    7. FUZZY RELATIONSHIP BETWEEN TIME AND COST
    8. SA BASED SOLVER
    9. A CASE STUDY AND RESULT ANALYSIS
    10. CONCLUSION
    11. ACKNOWLEDGMENT
    12. REFERENCES
  13. Call For Articles