Chapter 11. Network Ready for Use Testing Case Study

This chapter covers the following topics:

Background for the NRFU Testing Case Study

Sports and Entertainment Stadium Architecture Overview

Network Topology

Network Ready for Use Test Strategy

Most of the case studies that we have presented to this point involved system testing on a “prototype network system,” which frequently is a miniaturized representation of a proposed network topology, built and operated in a lab facility. This is the most common scenario for system testing, because test engineers are able to execute test plans in a controlled environment, where variables can be kept to a minimum. In this chapter, we present a case study of a completely different type of activity ...

Get Enterprise Network Testing: Testing Throughout the Network Lifecycle to Maximize Availability and Performance now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.