Notation

Capital English Letters

A

component availability (Chapter 11)

A

levelized annual cost, $ (Chapter 7)

A

weighted average Btu/kWh net generation (Chapter 2)

A, B, C

phase designation

A, B, C, D

general line (circuit) constants (Chapter 5)

AFDR

feeder availability (Chapter 11)

Ai

availability of component i (Chapter 11)

An

area served by one of n substation feeders, mi2

ASD

service-drop conductor size, cmil (Chapter 6)

ASL

secondary-line conductor size, cmil (Chapter 6)

Asys

system availability (Chapter 11)

AEC

annual equivalent of energy cost, $

AEICc

annual equivalent of total installed capacitor bank cost, $ (Chapter 8)

AIC

annual equivalent of feeder investment cost, $

B

average fuel cost, $/MBtu ...

Get Electric Power Distribution Engineering, 3rd Edition now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.