Chapter 8.7.2. Downtime history

Page 176

176 Certification Study Guide Series: IBM Maximo Asset Management V7.1 When defining a work type, you may enable this option by using the Downtime Prompt check box. Figure 8- 33 shows an example of the Emergency Maintenance work type that enables the downtime prompt. Figure 8- 33 Emergency Maintenance work type that enables downtime prompt The two options differ, as follows: The Other Organization Options action is more generic and services all work orders specified inside an organization The Downtime option, located in the Work Type action, is only considered if a work order specifies a work type that enables the Downtime Prompt check box. 8.7.2 Downtime history Assets downtime history can be edited by ...