RECOVERY

Assumption: The Unit Tests were properly constructed, and each associated group of units constituted an appropriate subsystem.

Pull together all the subsystem tests:

  • Check the traceability of each unit and unit test to the appropriate subsystem.

  • Check the inputs and outputs of each subsystem.

  • Check the interfaces and interface compatibility of each interfacing subsystem.

  • Check the loads of each subsystem.

  • Make changes as necessary.

  • Modify the system test as necessary and recheck the traceability to the requirements.

61 CONFIGURATION MANAGEMENT

61a (NO) The Configuration Management Plan (CMP) is not thorough, complete, or authorized

The Configuration Management Plan (CMP) is not thorough, complete, or authorized unless it follows the required ...

Get Blueprint for Project Recovery: A Project Management Guide The Complete Process for Getting Derailed Projects Back on Track now with the O’Reilly learning platform.

O’Reilly members experience books, live events, courses curated by job role, and more from O’Reilly and nearly 200 top publishers.