RECOVERY

The quick and dirty method of recovery is to lay out the initial requirements as stipulated in the specification and then identify where the requirement was proved in the System Test. If you can prove that the requirements were incorporated and your customer accepts the process, you are in luck. If not, you will be relegated to the "complete documentation" method.

The complete documentation method requires starting with the Requirements Traceability Matrix (RTM) and flowing each requirement into the unit and subsystem that will be built as a part of the system. The requirements must first be flowed down from the requirements document (contract) to the specification for each unit and subsystem and then flowed up in the Unit Test Plan, ...