RECOVERY

If you do not have an RFM you can use the following table as a start. Modify Table 5-8 below for your own needs. Just be sure not to change the concepts of content and flow.

Table 5-8. Requirements Flow-Down Matrix (RFM)
Spec ParaCompany ReqtWBSDesign Plan ParaS/C Plan ParaS/C A ParaS/C B Para
1.3.2 02-03-015.3.25.3.21.3.21.3.2
1.3.3 02-03-025.3.35.3.31.3.3N/A
1.3.4 02-03-035.3.45.3.41.3.41.3.4
 QA Plan04-01-018.2.68.2.64.3.64.3.6
 CM Plan05-01-019.3.19.3.15.6.25.6.2
       

If you do not have an RTM, you can use Table 5-9 on the following page as a start. Modify the table for your own needs. Just be sure not to change the concepts of content and flow.

57 PURCHASE ORDERS

57a (NO) The sum of all Purchase Orders does not reflect all purchases ...