RECOVERY

If you have an opportunity to renegotiate, use the following outline or one of your own. The point is to use a control mechanism. See Attachment 17.

  • Scope of the Document

  • Applicable Documents

  • Requirements

  • Item Definition

  • Performance Characteristics

    • The performance requirements related to manning, operating, maintaining, and logistically supporting the prime item to the extent these requirements define or constrain design of the prime item and include response time, throughput rates, and exclusion times

  • Physical Characteristics

    • The design constraints and standards necessary to assure compatibility of prime item components

  • Interfaces between the principal item being specified and other items with which it must be compatible

  • The major components ...