APPENDIX 6: DOCUMENT TEMPLATES

PROCEDURE

Image

Procedure text:

ACTIVITY RECOVERY PLAN

Image

When and how to use this plan

This activity recovery plan may be used at any time when operations are prevented, due to an incident or situation that prevents normal operations.

The activity should be recovered to a minimum acceptable level, within the recovery time objective (RTO) stated above.

Minimum acceptable level of activity

At or before the RTO (elapsed time following the interruption of activity), the following minimum levels of operational activity are required: ...